Standards
The standard is the starting brief
Every design starts from the applicable standard, not from a reference design.
Automotive, EMC, environmental, safety and defence
How a standard becomes a design input
Every design starts from the applicable standard, not from a reference design. At kickoff the standard is mapped clause by clause to design features and test evidence, so the cost of compliance is known before layout begins — not discovered at the test house.
What we test here, what we do not
Pre-compliance runs in our own lab: ESD, transient and surge injection, emissions pre-scan, RF immunity pre-checks, climatic and mechanical profiling, and long-run soak. Type approval and certification run at accredited laboratories — CISPR 25 and ISO 11452-2 measurements in particular require a chamber we do not operate, so those results are always third-party. We say which is which on every report.
Do you test CISPR 25 in-house?
We run a CISPR 25 pre-scan on our own bench. Formal CISPR 25 measurement requires an absorber-lined chamber and is carried out at an accredited laboratory.
Which ISO 7637-2 pulses can you simulate?
Pulses 1, 2a, 2b, 3a, 3b, 4 and 5, using automotive ECM test systems, including load dump and cranking profiles.
Are you an accredited laboratory?
No. We provide pre-compliance testing and evidence preparation. Certification is obtained at accredited third-party laboratories.